Maintenance Analytics
Track maintenance health, reliability, and preventive schedules
Open Tickets
…
2 critical
Avg. Resolution
…
Last 90 days
Tickets This Period
…
18 resolved
Oldest Open
…
Days since created
Open Tickets
| Title | Room | Severity | Category | Age |
|---|---|---|---|---|
| Lock mechanism sticking | The Haunted Manor | medium | broken prop | 6 days |
| Flickering ceiling light | The Vault | low | electrical | 3 days |
| Emergency exit sign dim | Laboratory of Doom | critical | safety | 1 day |
| Scuff marks on wall | The Haunted Manor | low | cosmetic | 12 days |
Issues by Category
Issues by Severity
Room Reliability Scores
Laboratory of Doom
90
The Vault
85
Jungle Adventure
72
Based on ticket frequency, severity, and resolution time over the last 90 days.
Preventive Maintenance Schedule
Weekly Lock Check
All Rooms
Tomorrow
Monthly Safety Audit
All Rooms
Feb 28
Prop Inspection
The Haunted Manor
Overdue (2 days)
Electronics Test
Laboratory of Doom
Mar 5
Resolution Summary
…
Avg. Resolution Time
…
Resolved This Period
…
Still Open